THE FACILITY

The land on which the Project will be built; Balıkesir Province is located in Güre Town of Edremit District and is 300 meters from the sea. In general, there are Mount Ida in the north and the coastline of the Gulf of Edremit in the south. Located on a sloping land, the settlement has a panoramic sea view and is also centrally located with road connections.

The main building, consisting of 1 block, is designed to take panoramic sea view to all apartments. The facility consists of 5 floors in total, including the 1st basement floor, ground floor, first, second and third floors. There are 149 apartments, 1 outdoor swimming pool, 1 indoor thermal pool, 1 Turkish bath, fitness center , and a total of 3 elevators in the building. The main carrier system of the structure is reinforced concrete.

The property features a restaurant with a closed area of 300 m², which carries the rich cuisine of the region next to your home, serving breakfast, lunch and dinner.

On the terrace of the property, there is a terrace bar cafe on an area of 300 square meters and panoramic sea view.

The common areas in the building can be easily accessed from each apartment without going outside the building. With galleries/atriums, roof skylights and wide corridors created in circulation areas, the spaces are designed to be bright and spacious.

Approximately 7.000 m² of the 11.000 m² land area is allocated as landscape area in the project. Thus, apartment owners are offered both landscape areas they can use and sea view.

Parking and vehicle paths are located on the outer perimeter of the parcel, and there is an outdoor swimming and thermal indoor pool and recreation areas in the inner courtyard.

On the coastal pedestrian walking axis, which is 300 meters away and can be reached on foot, there is a public beach and piers.

Open rest and promenade areas and various hobby centers, as well as a health unit providing 24/7 pre-health services under the supervision of a doctor.

The construction of the facility will be completed in September 2024 and the apartments will be handed over to their owners.